TOP
0
0
三民出版.新書搶先報|最速、最優惠的新鮮貨報給你知!
EARLY CONTRACTOR INVOLVEMENT IN BUILDING PROCUREMENT - CONTRACTS, PARTNERING AND PROJECT MANAGEMENT
滿額折

EARLY CONTRACTOR INVOLVEMENT IN BUILDING PROCUREMENT - CONTRACTS, PARTNERING AND PROJECT MANAGEMENT

商品資訊

定價
:NT$ 4750 元
優惠價
904275
若需訂購本書,請電洽客服 02-25006600[分機130、131]。
商品簡介
作者簡介
名人/編輯推薦
目次
相關商品

商品簡介

Can contractors and specialists add value to a project by their early involvement in design, pricing, risk management and programming? How can this be structured and what role do contracts have to play? What is the impact on procurement and project management?
Commentators from Banwell to Egan have recommended earlier contractor appointments, and this has also been linked to successful project partnering. How are the two related? Early Contractor Involvement in Building Procurement considers the case for a two stage procurement approach based on a system of agreed project processes during the preconstruction phase. It examines the ways in which a contract can describe and support this model throughout its procurement, partnering and project management, and is illustrated with case studies taken from projects and programmes across the construction and engineering industry.
The roles of the various parties involved, the obstacles they encounter and the benefits they can achieve are examined in detail. There is practical guidance on how to improve speed, economy, sustainability, change control, dispute avoidance, and client satisfaction. This book bridges the gap between contract law, partnering and project management and will be essential reading for middle and senior management at construction contractors, consultants and clients in both the public and private sectors.

作者簡介

David Mosey is head of the Projects and Construction Group at Trowers & Hamlins, and is a specialist in UK/international construction and engineering law with over 30 years’ experience. He advises project teams engaged on a wide range of building and infrastructure projects.
David has been described as a ‘partnering guru’ and has guided his clients through more than 200 partnered projects and programmes with values ranging from £1m to £800m. He is the author of PPC2000, the first Standard Form of Project Partnering Contract, and co-author of both the SPC2000 Specialist Partnering Contract and the TPC2005 Term Partnering Contract.

名人/編輯推薦

Moseys book is a treasure. It mulls over why things go belly up and over ways to prevent disputes. (building.co.uk, September 2009)
"This book bridges the gap between contract law, partnering and project management. It will be essential reading for middle and senior management and will be construction contractors, consultants and clients in both public and private sectors." (Government Opportunities, May 2009)

目次

Introduction – Who Remembers Mott the Hoople?
Chapter 1 Early Contractor Involvement – An Overview.
1.1 Early contractor involvement – why bother?
1.2 Early contractor involvement and project pricing.
1.3 Early contractor involvement and risk transfer.
1.4 Early contractor involvement and payment.
1.5 The role of building contracts.
1.6 The limits of construction phase building contracts.
1.7 Contractor contributions to design, pricing and risk management.
1.8 The client, communications and project programmes.
1.9 But do you need an early building contract?
1.10 Preconstruction commitments under framework agreements.
1.11 The infl uence of project managers and project partnering.
1.12 So what is stopping us?
1.13 Government and industry support.
Chapter 2 Conditional Contracts and Early Project Processes.
2.1 The conditional preconstruction phase agreement.
2.2 Recognised categories of contract.
2.3 Effect of the number of parties.
2.4 The planning function of contracts.
2.5 Choices and contractual conditionality.
2.6 Limited effi ciency caused by unknown items.
2.7 Risk and fear of opportunism.
2.8 Conditional relationships without full consideration.
2.9 Need for long-term relations.
2.10 Alignment of different interests.
2.11 Preconstruction phase agreements as project management tools.
2.12 Contracts and new procurement systems.
Chapter 3 Problems and Disputes Under Construction Phase Building Contracts.
3.1 Introduction.
3.2 The role of standard form building contracts.
3.3 Standard forms and the assumption of complete information.
3.4 Origins of standard forms and lack of trust.
3.5 Criticisms of effectiveness of standard forms.
3.6 Causes of claims.
3.7 Links between claims and preconstruction phase activities.
3.8 Links between claims and building contracts.
3.9 New procurement procedures or gambling on incomplete information.
Chapter 4 Early Contractor Involvement in Design, Pricing and Risk Management.
4.1 Introduction.
4.2 Preconstruction design processes.
4.3 Preconstruction pricing processes.
4.4 Preconstruction risk management processes.
4.5 Preconstruction subcontractor appointments.
4.6 Perceived benefi ts of early contractor appointments.
4.7 Early contractor appointments and sustainability.
Chapter 5 Client Leadership, Communication Systems and Binding Programmes 95
5.1 Introduction.
5.2 The role of the client.
5.3 The role of communication systems.
5.4 The role of binding programmes.
Chapter 6 Contractual and Non-contractual Preconstruction Options.
6.1 Introduction.
6.2 Building contract options.
6.3 Letters of intent.
6.4 Non-binding arrangements.
6.5 Benefi ts of contractual clarity.
Chapter 7 Preconstruction Commitments Under Framework Agreements.
7.1 Commercial attraction of frameworks.
7.2 The relationship between frameworks and partnering.
7.3 Frameworks and preconstruction phase processes.
7.4 Published forms of framework agreement.
7.5 Frameworks and the Private Finance Initiative.
7.6 The impact of frameworks on changing behaviour.
Chapter 8 Project Management and Project Partnering.
8.1 Introduction.
8.2 Preconstruction phase agreements and project management.
8.3 Preconstruction phase agreements and partnering.
Chapter 9 Obstacles to Early Contractor Appointments.
9.1 Introduction.
9.2 Project-specifi c obstacles.
9.3 Procedural obstacles.
9.4 Personal obstacles.
9.5 Education and training.
9.6 The role of the partnering adviser.
Chapter 10 Government and Industry Views and Experience.
10.1 Introduction.
10.2 Importance of government and construction industry support.
10.3 Support for contractor and subcontractor design contributions.
10.4 Support for two-stage pricing.
10.5 Support for selecting contractors by value.
10.6 Support for joint risk management.
10.7 Support for greater client involvement.
10.8 Government and industry views on partnering.
10.9 Government views on preconstruction phase agreements.
10.10 Industry experience of preconstruction phase agreements.
10.11 Preconstruction phase agreements in an economic downturn.
Chapter 11 Conclusions – the Golden Age Of Rock ‘n’ Roll?
11.1 Functions of building contracts and their potential to govern project processes.
11.2 The assumption in standard form building contracts of complete project information and consequent problems and disputes.
11.3 Preconstruction phase processes that can be improved by early contractor appointments.
11.4 The role of the client, communication and programming of preconstruction phase processes.
11.5 Contractual and non-contractual options to govern preconstruction phase processes.
11.6 Increased preconstruction commitments under framework agreements.
11.7 The relationship of preconstruction phase agreements to project management and partnering.
11.8 Circumstances and attitudes that are obstacles to early contractor appointments or to preconstruction phase agreements.
11.9 Government and industry support for early contractor appointments under preconstruction phase agreements.
Appendix A Project Case Studies.
Use of Preconstruction Phase Agreements on Single Projects.
Use of Preconstruction Phase Agreements on Multi-project Frameworks.
Appendix B Preconstruction Phase Processes Under Standard Form Building Contracts.
1 Introduction.
2 Design development.
3 Two-stage pricing.
4 Risk management.
5 Communications.
6 Programmes.
7 Team integration.
Appendix C Preconstruction Phase Processes Under Standard Form Framework Agreements.
Introduction.
JCT Framework Agreements.
NEC3 Framework Contract.
Appendix D Form of Risk Register.
Appendix E Form of Partnering Timetable.
Appendix F Association of Partnering Advisers Code of Conduct.
Appendix G Bibliography.
Part 1 Contract forms.
Part 2 Articles and books .
Part 3 Government/industry reports .
Part 4 Table of cases.
Index.

您曾經瀏覽過的商品

購物須知

外文書商品之書封,為出版社提供之樣本。實際出貨商品,以出版社所提供之現有版本為主。部份書籍,因出版社供應狀況特殊,匯率將依實際狀況做調整。

無庫存之商品,在您完成訂單程序之後,將以空運的方式為你下單調貨。為了縮短等待的時間,建議您將外文書與其他商品分開下單,以獲得最快的取貨速度,平均調貨時間為1~2個月。

為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。

若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。

優惠價:90 4275
若需訂購本書,請電洽客服 02-25006600[分機130、131]。

暢銷榜

客服中心

收藏

會員專區