名人/編輯推薦
目次
書摘/試閱
相關商品
名人/編輯推薦
《全國船舶工業職業教育教學指導委員會推薦教材?示范性高等職業院校船舶專業英語規劃教材:船舶動力英語》可作為輪機工程技術(船舶動力方向)專業三年制高職或五年制高職的全日制教材,也可供輪機工程技術專業的本科學生及相關技術人員參考。
目次
Unit 1 The Principle of Marine Diesel Engine
Passage
Complementary Reading
Tips
Unit 2 Diesel Engine Construction
Passage
Complementary Reading
Tips
Unit 3 Diesel Engine system
Passage
Complementary Reading
Tips
Unit 4 Marine Pumps Types
Passage
Complementary Reading
Tips
Unit 5 Marine Boilers
Passage
Complementary Reading
Tips
Practical Training One
Unit 6 Hydraulic Deck Machinery
Passage
Complementary Reading
Tips
Unit 7 The Propulsion Plant
Passage
Complementary Reading
Tips
Unit 8 Shafting and Propeller
Passage
Complementary Reading
Tips
Unit 9 The Ship Piping System
Passage
Complementary Reading
Tips
Unit 10 Sea Trials
Passage
Complementary reading
Tips
Practical Training Two
Appendix 1 New Words and Expressions
Appendix 2 Vocabulary
Appendix 3
References
Passage
Complementary Reading
Tips
Unit 2 Diesel Engine Construction
Passage
Complementary Reading
Tips
Unit 3 Diesel Engine system
Passage
Complementary Reading
Tips
Unit 4 Marine Pumps Types
Passage
Complementary Reading
Tips
Unit 5 Marine Boilers
Passage
Complementary Reading
Tips
Practical Training One
Unit 6 Hydraulic Deck Machinery
Passage
Complementary Reading
Tips
Unit 7 The Propulsion Plant
Passage
Complementary Reading
Tips
Unit 8 Shafting and Propeller
Passage
Complementary Reading
Tips
Unit 9 The Ship Piping System
Passage
Complementary Reading
Tips
Unit 10 Sea Trials
Passage
Complementary reading
Tips
Practical Training Two
Appendix 1 New Words and Expressions
Appendix 2 Vocabulary
Appendix 3
References
書摘/試閱
1. Foundation
The foundation of marine pumps is a steel base frame. Ensure the foundation has set hard before mounting the pump set. The surface must be smooth and flat. Position the pump on the steel base frame or foundation, then align and bolt in position.
2. Alignment of Pump and Driver
After fitting and bolting on the driver, centre it in the flange.
3. Connecting the Piping
Never use the pump as an anchorage point for the piping. The pipes must be supported very near the pump and connected to the pump without transmitting any stresses or strains to it. Make sure the pump does not bear the weight of the piping. The nominal bore of the pipes should be the same as or greater than that of the pump nozzles. The suction pipe must not have any valves, fittings etc. , which might interfere with the flow, at a distance of not less than 5 times the suction pipe bore from the pump,to ensure uniformity of flow to the impeller.
4. Coupling Guard
Safety regulations specify that the pump can only be operated if the coupling has a guard. The coupling guard must be fitted before startup.
5. Final Check
It must be possible to rotate the rotor easily by manually turning the coupling through 360°. Ensure all auxiliary lines are correctly connected up.
6. Maintenance
(1)The pump must run quietly, smoothly and free from vibrations at all times. Rough running can cause damage to the bearings and shaft seal.
(2) The pump must never run dry.
(3) The temperature of the ball and roller bearings may rise to 50 ℃ above ambient temperature but must not exceed 80 ℃. The shut-off valves in the various supply lines must not be closed during operation.
(4) Standby pumps must be started-up from time to time to ensure that they are in a state of constant readiness; also rotate the shaft by hand at frequent intervals.
(5) A sealant reservoir for the mechanical seal should always be filled with water containing a washing up liquid.
(6) Lubricate the pump as described in the design and operating instructions.
(7) Before working on the pump and driver, switch the set off and ensure it cannot be accidentally switched on. Switch off and lock off the main switch.
(8) If it is likely that handling and storage has caused the grease to become contaminated, solidify, drain or form condensed water, make sure the pump is repacked before startup.
The pump must also be repacked every time the bearings are dismantled.
(9) Check the mechanical seal every day for overheating. A leaking seal should be removed, checked and replaced, if necessary.
主題書展
更多
主題書展
更多書展今日66折
您曾經瀏覽過的商品
購物須知
大陸出版品因裝訂品質及貨運條件與台灣出版品落差甚大,除封面破損、內頁脫落等較嚴重的狀態,其餘商品將正常出貨。
特別提醒:部分書籍附贈之內容(如音頻mp3或影片dvd等)已無實體光碟提供,需以QR CODE 連結至當地網站註冊“並通過驗證程序”,方可下載使用。
無現貨庫存之簡體書,將向海外調貨:
海外有庫存之書籍,等候約45個工作天;
海外無庫存之書籍,平均作業時間約60個工作天,然不保證確定可調到貨,尚請見諒。
為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。
若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。