Concept Clarity: Project management
商品資訊
ISBN13:9798472746816
出版社:Independently published
作者:Jerry Leonard
出版日:2021/09/07
裝訂:平裝
規格:20.3cm*12.7cm*1.4cm (高/寬/厚)
商品簡介
相關商品
商品簡介
This report was written in connection with a study assignment for Concept, called "Public procurement, forms of contracting and contract models - the Armed Forces' utilization of public framework conditions for major investments ". The main purpose of the report is to establish an overview of possibilities and limitations in the Public Procurement Act (LOA) and the Procurement Regulations for the Armed Forces (ARF) for early-stage contracts for large and complex projects. Complex projects will often need external actors in the early phase. At the same time it is restrictions for the same external players to participate in a later competition.
The report will assess the scope for using external players before (final) competition has taken place at the same time as these players are later allowed to participate in the actual the competition.
Having to use external actors in several project phases is often based on specific needs. The report will therefore take a closer look at the Armed Forces' (future) need for external support related to the peculiarities of the defense market. The report will also assess "best practice" for projects using external actors in the early phase.
It is emphasized that the report will only affect matters which include procurement above the threshold values as set out in the LOA.
It is a prerequisite that the study assignment must have cross-sectoral validity so that they can be used as part of the development of quality assurance across different ministries, even if the work focuses on issues from the Armed Forces' activities. Comparison of LOA and ARF and elucidation of the flexibility access for choice of contracting procedures as well as identification of key differences are assumed to be relevant for sectors other than just the Armed Forces.
The report will assess the scope for using external players before (final) competition has taken place at the same time as these players are later allowed to participate in the actual the competition.
Having to use external actors in several project phases is often based on specific needs. The report will therefore take a closer look at the Armed Forces' (future) need for external support related to the peculiarities of the defense market. The report will also assess "best practice" for projects using external actors in the early phase.
It is emphasized that the report will only affect matters which include procurement above the threshold values as set out in the LOA.
It is a prerequisite that the study assignment must have cross-sectoral validity so that they can be used as part of the development of quality assurance across different ministries, even if the work focuses on issues from the Armed Forces' activities. Comparison of LOA and ARF and elucidation of the flexibility access for choice of contracting procedures as well as identification of key differences are assumed to be relevant for sectors other than just the Armed Forces.
主題書展
更多
主題書展
更多書展今日66折
您曾經瀏覽過的商品
購物須知
外文書商品之書封,為出版社提供之樣本。實際出貨商品,以出版社所提供之現有版本為主。部份書籍,因出版社供應狀況特殊,匯率將依實際狀況做調整。
無庫存之商品,在您完成訂單程序之後,將以空運的方式為你下單調貨。為了縮短等待的時間,建議您將外文書與其他商品分開下單,以獲得最快的取貨速度,平均調貨時間為1~2個月。
為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。
若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。