TOP
0
0
三民出版.新書搶先報|最速、最優惠的新鮮貨報給你知!

縮小範圍


商品類型

原文書 (11)
商品狀況

可訂購商品 (11)
庫存狀況

無庫存 (11)
商品定價

$800以上 (11)
出版日期

2016年以前 (11)
裝訂方式

平裝 (11)
作者

Not Available (NA) (4)
Japan Institute of Plant Maintenance (EDT) (2)
Productivity Press Development Team (2)
Productivity Development Team (1)
Productivity Press Development Team (COR)/ Shigeo Shingo (1)
Productivity Press Development Team (EDT) (1)
出版社/品牌

Productivity Pr (11)

三民網路書店 / 搜尋結果

11筆商品,1/1頁
作者:Not Available (NA)  出版社:Productivity Pr  出版日:2003/06/01 裝訂:平裝
In Identifying Waste on the Shopfloor, the Productivity Development Team has created an excellent guide to quickly understanding, identifying, and eliminating shopfloor waste. From inventory waste to
無庫存,下單後進貨(到貨天數約30-45天)
定價:2577 元, 優惠價:1 2577
作者:Not Available (NA)  出版社:Productivity Pr  出版日:2002/01/01 裝訂:平裝
Kaizen, which simply means continuous improvement, is the foundation of all lean production improvements. Kaizen events are opportunities to make focused changes in the workplace.Kaizen for the Shopf
無庫存,下單後進貨(到貨天數約30-45天)
定價:2577 元, 優惠價:1 2577
作者:Productivity Press Development Team (EDT)  出版社:Productivity Pr  出版日:2002/08/01 裝訂:平裝
Standard work is an agreed upon set of work procedures that effectively combines people, materials, and machines to maintain quality, efficiency, safety, and predictability. Work is described precisel
無庫存,下單後進貨(到貨天數約30-45天)
定價:2577 元, 優惠價:1 2577
作者:Productivity Press Development Team  出版社:Productivity Pr  出版日:2002/05/01 裝訂:平裝
In a "pull" production system, the final process pulls needed parts from the previous process, which pulls from the process before it, and so on, as determined by customer demand. This allows you to o
無庫存,下單後進貨(到貨天數約30-45天)
定價:2397 元, 優惠價:1 2397
作者:Productivity Development Team  出版社:Productivity Pr  出版日:1999/03/01 裝訂:平裝
Cellular manufacturing involves rearranging traditional operation-based factory layouts into process-based cells that promote a smooth production flow by cutting waste. Cellular Manufacturing: One-Pi
無庫存,下單後進貨(到貨天數約30-45天)
定價:2577 元, 優惠價:1 2577
作者:Not Available (NA)  出版社:Productivity Pr  出版日:1999/07/01 裝訂:平裝
Overall Equipment Effectiveness (OEE) is a crucial measure in TPM that reports on how well equipment is running. It factors three elements ---the time the machine is actually running, the quantity of
無庫存,下單後進貨(到貨天數約30-45天)
定價:2579 元, 優惠價:1 2579
作者:Productivity Press Development Team  出版社:Productivity Pr  出版日:2002/03/01 裝訂:平裝
Kanban is the name given to the inventory control card used in a pull system. The primary benefit of kanban is to reduce overproduction, the worst of the seven deadly wastes. A true kanban system prod
無庫存,下單後進貨(到貨天數約30-45天)
定價:2397 元, 優惠價:1 2397
作者:Productivity Press Development Team (COR); Shigeo Shingo  出版社:Productivity Pr  出版日:1996/10/01 裝訂:平裝
Changeover is the process of setting up a production line for a different process or product. Many plants take hours or even days to do a changeover - a major barrier to manufacturing flexibility. Qu
無庫存,下單後進貨(到貨天數約30-45天)
定價:2577 元, 優惠價:1 2577
作者:Not Available (NA)  出版社:Productivity Pr  出版日:1998/06/01 裝訂:平裝
Are you ready to implement a just-in-time (JIT) manufacturing program but need some help orienting employees to the power of JIT? Here is a concise and practical guide to introduce equipment operators
無庫存,下單後進貨(到貨天數約30-45天)
定價:2397 元, 優惠價:1 2397
作者:Japan Institute of Plant Maintenance (EDT)  出版社:Productivity Pr  出版日:1996/09/01 裝訂:平裝
TPM for Every Operator covers the information that needs to be communicated to operators when facilitating a company-wide TPM initiative. It covers the main aspects of TPM, introducing frontline worke
無庫存,下單後進貨(到貨天數約30-45天)
定價:2697 元, 優惠價:1 2697
作者:Japan Institute of Plant Maintenance (EDT)  出版社:Productivity Pr  出版日:1997/09/01 裝訂:平裝
TPM leads to soaring productivity when your operators are positively and energetically involved in the maintenance of their own equipment. Autonomous Maintenance for Operatorsteaches specific autonomo
無庫存,下單後進貨(到貨天數約30-45天)
定價:2577 元, 優惠價:1 2577

暢銷榜

客服中心

收藏

會員專區