TOP
0
0
購書領優惠,滿額享折扣!
MOTION AND TIME STUDY 3/E

MOTION AND TIME STUDY 3/E

商品資訊

定價
:NT$ 820 元
絕版無法訂購
商品簡介
作者簡介
目次
相關商品

商品簡介

For courses in Motion and Time Study, and Work Design.

Motion and time study has finally found a home in the modern plant by helping employees to understand the nature and the true costs of work, assist management in reducing unnecessary costs, and balance work cells to make work flow smoother. This how-to motion and time study text provides students and practitioners with a resource that describes the techniques and procedures of motion and time study. Practical, detailed advice is given on all aspects of motion and time study including work station design, job analysis, and the techniques of setting time standards.

作者簡介

Fred E. Meyers is president of Fred Meyers and Associates, an industrial engineering management consulting company. He designs and implements production improvement and motivation systems. Mr. Meyers is a registered professional industrial engineer and a senior member of the Institute of Industrial Engineers. He has 35 years of industrial engineering experience. He has worked for Caterpillar Tractor Co., Boeing's aerospace division, Mattelloy Co., Times Mirror Corp., Ingersoll-Rand's proto tool division, Spaulding's golf club division, and Southern Illinois University-Carbondale, College of Engineering, where he taught for 20 years while starting and operating his consulting business. He was director of applied research and an associate professor.

Mr. Meyers has worked for over 100 companies as a consultant responsible for installing incentive systems, performance control systems, plant layouts, new product startup, and cost estimating systems. He has worked in heavy equipment manufacturing, aerospace, consumer products, appliance manufacturing, lumber, plywood, paper, oil blending and packaging, furniture, tooling, fiberglass, and many other areas. The variety of his assignments has given him the ability to see the wide-ranging uses of motion and time study.

Fred E. Meyers has taught motion and time study to over 130 classes and 5,000 people, including professional engineers and managers, union stewards, and college students. He has presented seminars to the National Association of Industrial Technology, industrial plants, the U.S. Air Force and Navy, and labor unions.

James R. Stewart is Associate Professor of Technology at Northern Illinois University. For the past decade, he has taught plant layout, engineering economy, manufacturing philosophy, production and inventory systems, industrial quality control, ergonomics, and work measurement and improvement. He is a Fellow in the World Academy of Productivity Science. He is a senior member of the Institute of Industrial Engineers and is a founding member and is on the board of directors of the Society for Work Science. He is also on the board of The International MODAPTS Association. He is an active member of a number of other societies, including NAIT, ASQ, and Human Factors and Ergonomics Society. He has 30 years of experience in work measurement in education, government, and industry.

Dr. Stewart has served on the faculty of several universities; worked in city, county and state productivity programs; and has managed engineering programs in electronics assembly, electronics component fabrication, pulp and paper fabrication, fiberglass processing, industrial tape manufacturing, and engineering consulting. He has published many articles about unique applications of work measurement. James R. Stewart has taught motion and time study in credit and noncredit courses for over 25 years. He has been certified and taught a number of predetermined time systems, including MOST, Work Factor, MTM-1, and MODAPTS.

目次

 1. Introduction to Motion and Time Study. 

 2. Motion and Time Study for the Lean Environment. 

 3. History of Motion and Time Study. 

 4. The Importance and Uses of Motion and Time Study. 

 5. Techniques of Methods Design: The Product Flow Macromotion. 

 6. Techniques of Micromotion Study: Operations Analysis. 

 7. Motion Study: The Work Station Design. 

 8. Predetermined Time Standards (PTS) System. 

 9. Stopwatch Time Study.

10. Standard Data and Its Uses in Balancing Work.

11. Work Sampling.

12. Indirect Labor and Motion and Time Study.

13. Performance Control Systems.

14. Wage Payment Systems.

15. Time Management Techniques.

16. Attitudes and Goals for Industrial Engineers.

Appendix A: Forms.

Appendix B: Answers to Problems.

Index.

您曾經瀏覽過的商品

購物須知

為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。

若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。

定價:100 820
絕版無法訂購

暢銷榜

客服中心

收藏

會員專區